ci: re-trigger build (previous run interrupted by host overload)
All checks were successful
build-and-push / build (push) Successful in 1m4s
All checks were successful
build-and-push / build (push) Successful in 1m4s
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -7,6 +7,7 @@ name: build-and-push
|
||||
# (ingen insecure-registry-config behövs där).
|
||||
#
|
||||
# Pull:a på Pi5 med localhost:5000/archivum:latest (t.ex. i dockge-stacken).
|
||||
# rebuild trigger: 2 (previous run was interrupted by a host overload)
|
||||
on:
|
||||
push:
|
||||
branches: [main, master]
|
||||
|
||||
Reference in New Issue
Block a user